Print Page | Contact Us | Report Abuse | Sign In | Create an Account
Online Store: Case Histories
Main Storefront
        

GBA CASE HISTORY # 110

Item Options
Sign in for your pricing!
Price: $350.00
Quantity: *
 
Description

A public-school district (the “District”) retained the Member Firm to perform geotechnical-engineering studies for several buildings at two schools.  The Member Firm’s geotechnical reports both contained identical recommendations for “select” fill to be used in constructing the building pads for the schools.
The district retained different design teams for the two schools and the Project Specifications for the two schools, differed significantly and were inconsistent with member firm's recommendations.
When the field representative discovered onsite mixing of native soil with import material, a clear violation of the geotechnical recommendations, problems and disputes started.

 

 

Building pad, Arbitration , ASTM D698 , Atterberg limits tests , Attorney , CoMET service, Compaction testing , Design team , Earthwork ,Fill ,Mixing fill ,Moisture-density test, Noncompliant fill, On-call CoMET services ,Plasticity index