|
GBA CASE HISTORY # 51
| Description |
Member-Firm conducts geotechnical engineering study with recommendation for excavating and grading, and COMET Services for residential development with the designs of lagoons in a riverside property. The member-firm got entangled in the lawsuit between the civil engineer's firm and the client representative. agreement-formatted proposal; Bay mud; CoMET; construction-claims attorney; construction-materials engineering and testing; Corps of Engineers; dewatering; earthwork constructor; geotechnical engineering; go/no-go analysis; housing development; lagoons; limitation of liability; professionalism; project kick-off meetings; release of liability; residential developer; residential projects; riprap; water features
|
|