This case history chronicles the member firm, working as an expert consultant found evidence of incomplete geotechnical and environmental characterization of the subsurface conditions at a site adjacent to a river. Also disturbing were the stated findings of a third-party independent consultant.
Atterberg limits tests; chemical testing; clayey sand; dewatering contractor; discharge permit requirements.; environmental remediation ;permit; geotechnical ; gravel ; groundwater sampling ;hollow stem auger ; sumping ; laboratory ; water sample;