Print Page | Contact Us | Report Abuse | Sign In | Create an Account
Online Store: Case Histories
Main Storefront
        

GBA CASE HISTORY # 34

Item Options
Sign in for your pricing!
Price: $350.00
Quantity: *
 
Description
Member-Firm performs geotechnical engineering study on a foundation design and observe foundation construction for a parking garage addition for a health clinic. The construction manager's site superintendent hires a pressure-injected-footing constructor. The contactor quotes a price without checking the member-firm's geotechnical report which leads to problems and cost overruns.

 

CoMET; construction manager; fast track; financial fortitude; garage design; geotechnical engineering; health-maintenance organization; leadership; project management; risk; test piles; triangulated communication