Print Page | Contact Us | Report Abuse | Sign In | Create an Account
Online Store: Case Histories
Main Storefront
        

GBA CASE HISTORY # 18

Item Options
Sign in for your pricing!
Price: $350.00
Quantity: *
 
Description

 Member-Firm conducts geotechnical engineering study with recommendation for a small flood control pump station to be built on a marsh land, and the firm narrowly avoided the damages that occurred when recommendations for a flood-control pump station were not followed. 

 

CoMET, confirmation-dependent recommendations, continuity of service, crack-and-damage survey, delay risks, documentation, geotechnical engineering, litigation, minutes, observational method, proposals