Member-Firm conducts geotechnical engineering study with recommendation for a small flood control pump station to be built on a marsh land, and the firm narrowly avoided the damages that occurred when recommendations for a flood-control pump station were not followed.
CoMET, confirmation-dependent recommendations, continuity of service, crack-and-damage survey, delay risks, documentation, geotechnical engineering, litigation, minutes, observational method, proposals