Member-Firm develops recommendations for dike construction, on a multi-cell sewage lagoon located in a valley within an agricultural area. The Member Firm went along with a reduced scope of service in order to accommodate the client’s budgetary problems. The result was a major loss.
CoMET, daily field report, details, derivative liability, documentation, field representatives, fluid retention structures, geotechnical engineering, go/no-go analysis, irrigation, local government. soil/structure interrelationships