Print Page | Contact Us | Report Abuse | Sign In | Create an Account
Online Store: Case Histories
Main Storefront
        

GBA CASE HISTORY # 12

Item Options
Sign in for your pricing!
Price: $350.00
Quantity: *
 
Description

Member-Firm develops geotechnical engineering study with recommendations and performs limited COMET services for a tennis court to be built 14 feet below the surface and covered by parking deck. Since the constructor did not read the geotechnical report, a 100-footwide landslide occurred taking out the bottom of the unreinforced concrete retaining wall, then rolling into the excavation and demolishing the completed work. That led to a new retaining wall and litigation.

 

ambiguity, assumptions, churches, clubs, comet, communications, confirmation-dependent recommendations, geotechnical-engineering, landslide, non-profit clients, out-of-town constructors, parking deck, preconstuction meeting, retaining walls, surety,